Roof Claim Answers

How does insurance handle the rebuild after water and mold damage?

Short answer. After a covered water loss with mold, insurance usually pays in phases: drying and mitigation, mold remediation up to any sublimit, clearance, and then the rebuild of what was removed. Each phase often has its own estimate and sometimes its own contractor. The rebuild should restore the home to its pre-loss condition with like kind and quality materials, and it should start only after the water source is fixed and the area is confirmed clean.

The order of work

  1. Stop the source. Repair the roof or plumbing that let water in.
  2. Mitigation. Extract water, set drying equipment and remove soaked materials.
  3. Remediation. Contain and remove mold, clean framing and surfaces.
  4. Clearance. Confirm the area is dry and clean, sometimes with testing.
  5. Rebuild. Insulation, drywall, trim, cabinets, flooring and paint.

How the rebuild is paid

Things that often get missed

Watch the mold limit

Ask the adjuster which rebuild costs are being counted against the mold sublimit and which fall under the main dwelling coverage. That decision can change how much of the rebuild is paid.

Related: interior water damage coverage, code upgrades and mortgage company checks.

In depth

How does a roof payment schedule endorsement change what insurance pays for my roof?Roof surfacing payment schedules and ACV roof endorsements explained, with a worked example showing how roof aWhat is a cosmetic damage exclusion on a roof, and does my policy have one?What a cosmetic damage exclusion says, why it hits metal roofs hardest, how to find one in your Georgia policyDoes homeowners insurance cover interior water damage from a roof leak?When interior damage from a roof leak is covered: storm openings, gradual leak exclusions, mold limits, and wh

People also ask